Sorry, guys, I have not found the time to plan out the next seminar because of workload. We are now in the acoustic construction stage of the new GMA7 studios on EDSA (the big construction you see next to the GMA Network Center and MRT on EDSA) where I am acoustical consultant; the rehabilitation of the Lung Center of the Philippines Auditorium; pre-construction of the new Mission Training Center of the Chuirch of the Latter Day Saints in White Plains;refurbishment of the UP Law Center Auditorium in Diliman; conceptual design stage of a huge, multi-storey hotel and residences in Makati, right at the corner of Makati Ave. and Pasay Road, as well as smaller projects such as home theaters, studios and churches. So, .. just hang on there. Once the work load is a little lighter (I have acoustics apprentices training with me at the moment), we'll do a series of acoustics, recording, mixing and other facets lined up for you. This may happen sooner than you think. At sali kayong lahat.
Thanks for your patience. Best regards,
FWIW