its a big milestone for me. usable na yung room but still not 100% complete.
1. aircon will be installed in 3 days
2. wood flooring - suspended for lack of funds. laki ng gap sa ilalim ng inner door tuloy.
3. acoustic treatment - select places pa lang. wala fabric na pang cover sa four walls ng rockwool tapos kailangan ko maghanap ng decorative wood para sa mga helmholtz resonators.
noong 2011, nagsimula sya sa ganito
50 sheets gypsum for 3 layers, 76 pieces of 2x4 lumber, 1500 gypsum screws later
room within a room - average gap between inner and outer walls is 3"
some gaps are 6" wide. i had a lot of wasted space between the front and back walls due to pillars.
dami rockwool, 1/4 lang yun nung binili ko
ilalagay ko yung rockwool sa gitna ng studs tapos babalutan ng tela at palo china
for the inner room door, i used the same door from before the renovation
last layer ng gypsum natapos kanina
i used LED bulbs on track lights para small holes lang ang gagawin sa gypsum
the only serious hole on my gypsum wall is for the split aircon duct
di ko lang nakunan yung window, i have a usable window which is seen on the 3rd pic. i really wanted the window to be glass to let sunlight in but with a strict budget constraint. i opted for a 2x4 frame with 3/4 marine ply on the outsite and another 2 layers of gypsum. very heavy.
salamat ng marami kay sir mikep at kay botbenz at sa iba pang nakakausap ko dito sa thread
mission accomplished